Here is the tentative list of all the things I got done/wanted to get done this summer (not necessarily in this order):
Back
To be done by end of August 2002
- Install all new gaskets DONE
- Install all new head studs DONE
- Re-Install lifters and new Push Rods DONE
- Install fuel pump DONE
- Attach distributor DONE
- Buy and install new spark plugs DONE
- Attach water pump and fan DONE
- Obtain and attatch Generator DONE
- Dismantel and rebuild twin carbs DONE
- Clean up transmission and make necessary adjustments DONE
- Attach Flywheel/Starter/Clutch/Transmission DONE
- Attach the whole sha-bang to the frame DONE
- Buy and attach Exhaust System DONE (well, headers anyway)
- Hook up necessary electronics and give it a whirl DONE!! And it TURNS OVER!!
- Now the Water pump siezed and i have to wait to get a new one. But once that is in we are in Business!
- Got a new Water pump and got the car to RUN AND DRIVE!
Then depending on how much of all that really gets done, and how much money I have left in the bank, work on the following:
- Prep Body tub and bonnet for painting
- Weld new floor pans in
- Sit back and have a cold one...or two..or a case
- Paint it ALL!
- Buy and install interior
- Recover and install seats
- re-attach Roll-Bar (maybe)
- Re-attatch all mouldings (Chiefly Brit. var. of molding:-) and bumpers
And towards the end...when i have more time...and more money:
- Attatch and clean Top
- Re-furbish dash wood and shifter knob
- Strip and polish head cover
- Polish Dashpot Covers
- Sandblast and repaint front shocks