MULTITEST UPGRADES



  1. BASE HANDLER
    1. SW UPGRADE TO V6.12(WAITING FOR IC NEEDED)
    2. I/P MAGAZINE UPGRADE(5V TO 12 V GREATER TORQUE)
    3. FEED SHUTTLE SHAFT UPGRADE
    4. TURN SHUTTLE SHAFT UPGRADE
    5. HOSE FITTINGS STANDARDIZATION
    6. CONTACT SITE HOSE COLOR CODING(BLUE-PRESTOPPER, BLACK-PLUNGER, CLEAR-LOWER STOPPER)

  2. ATL/ATU
    1. CONVERSION KITS STANDARDIZATION(TUBE HOLDERS, TUBE RECEPIENTS)
    2. ATU TUBE STACKER
    3. ATL/ATU NEW TYPE
    4. ATL/ATU SW UPGRADE TO V1.22
    5. DIP TUBE CENTRALIZER
    6. PLCC TUBE CENTRALIZER FACE PLATE
    7. LOADING TIME SETTING UPGRADE 12 TO 6

  3. BASE HANDLER CONVERSION KITS
    1. PLCC CONTACT CASSETE FACEPLATE(CHAMFERED)
    2. DIP LOWER STOPPER LOCK
    3. SPRING LOADED CONTACT CASSETE
    4. SPRING LOADED CONTACTOR MUSHROOM
    5. DIP CONTACTOR UPGRADE(DIVIDER MILLED-OFF)
    6. LIGHT SENSOR UPGRADE TO INFRARED
    7. SORT BIN KEYS
    8. DIP SINGULATOR TOP BAR U/G(MILLED OFF)
    9. CONTACT BLOCK FITTING STANDARDIZATION

    end-11/01/2000-jong ignacio