Site hosted by Angelfire.com: Build your free website today!

THE TOURING PRINCIPLE , AUTUMN 1979 EQUIPMENT

 

Four Le maitre Pea souper fog machines

Two concept Genie smoke machines
Eight 16 joule strobes on a sequencer
14 four foot ultra violet tubes
Two pyramid robots (Hewie and Dewie) radio controlled
One column robot ( Big Al) radio controlled
One Alderham 72x2kW/2x10kW dimmer
One Alderham 481 control desk
Four Berkeley Colortran four cell 2kW groundrows
40 12V 50W par 36 lamps
100 110V 1000W par 64 lamps
Six Le Maitre Bullet Beams
Two Rank Strand 1000W CS1 follow spots
Two 24ft Genie hoists
Two Genie superlifts
One flying system
One 40ft Telestage Truss
Power Requirements :
Three x 200amps plus One x 60amps or Three x 100amps plus Three x 60amps or Three 100amps,plus One x 60amps and a Three phase generator

And for the venue manager

1. The staging will arrive at the venue at about 9am and the rigging crew will expect eight crew to be there

2. 50 kilos of dry ice ( Cardice) pellets/chips at each show to arrive no later than 4pm

3. A fully qualified electrician, fully conversant with the venue to be in attendance at 11am , 4pm and at least half an hour before the programme begins

4. A constant supply of hot tea throughout the day

5. Meal to be ready at 5.30pm

6. Your representative should be available all day

7. Sound checks at approximately 4pm

8.Four fire extinguishers suitable for eclectic fires to be available on stage

HOME