Site hosted by Angelfire.com: Build your free website today!

Employment


From September 1991 Till March 1992 :
El-Wadi El-Akhdar Company: Design Engineer for concrete and steel construction.

From March 1992 Till August 1996 :
National Authority for Tunnels - Studies Department :
(*) Design Engineer fo Cairo Metro Line # 2 for reviewing the design of the following :

1) Over-ground stations: as Shubra El-Kheima Station
2) Under-ground stations : as El-Mazallat Station.
3) Tunnel part constructed by cut-and-cover method : as the part between Mazallat and Khalafawi stations.
4) Tunnel part made by Tunnel Boring Machine (TBM) : as part of tunnel under the Nile River.
5) Steel Structures : as in Shubra El-Kheima workshop structures. The workshop is a group of many buildings for repairing trains and over an area of 65000 square meters and includes : General workshop, Light repair workshop, Diesel Engine Workshop, Paint shop, Train Washing machine , Test tracks, ... , etc.
(**) Reviewing site reports of Soil Treatment (Injection).
(***) Quality Control for material used in Construction.

From August 1996 Till Now :
Building , Housing and Urban Planning Research Centre Working as a teaching assistant in the Reinforced Concrete Department.