Above Ground Fire Protection System
This project was completed within the Client's specified time and budget.
Cawse Laterite Nickel Processing Project
This project was completed within the Client's extended time and budget. The Bondstrand installation has out performed other well known fibreglass systems utilised on other areas of this site by the way of hassle free installation and localised back-up and servicing from their local approved installer -Wenco Pty Ltd.
Griffin Venture FPSO Seawater Cooling Upgrade Project
This project was completed within the Client's time and budget. Bondstrand Series 7000M system chosen to replace a failing lined carbon steel system.
Thevenard Island Produced Water Disposal System Upgrade
The carbon steel system was failing after only eighteen months in service from various causes including: sulphur reducing bacteria; H2S; CO2. The client, West Australian Petroleum, can now expect their Bondstrand pipework to last longer than the operational life of the oil & gas producing fields our system services.
Wandoo Full Field Development Concrete Gravity Base Substructure Project
This project was completed within the projects specified time frame and budget, even though major design changes were instigated in mid contract. Wenco provided 24 hour services during the continuous concrete pour stage of construction.