Site hosted by Angelfire.com: Build your free website today!

Lewis Boat Works: Custom Boat building and Plans

 

Fisher10  - Page 4 

4.22.2002

 

Work continues after a (looong) break for NG Drill(s), Work and Weather. Finally its warm enough and I have enough time to work on the boat. I hope to go 3D and stitch the boat together before I have to go to work today.

As you can see, I was able to do some work after all. Here are the bottom panels stitched together.

 

 

And this is the bottom of the boat. 3D at last. But there is more.

 

Here we see the bow "V" a little better. The sun wasn't in the best position for this shot.

 

 

Here we have the sides stitched to the bottom. The stitches extend for about 4 ft forward.

 

 

Click HERE or check the Designs Page for a Pic. of what it should (WILL!) look like.

On to the next page

Back