Polo Grounds Shuttle
The Anderson Ave Tunnel under construction
Order Prints Print Photos  |  View Full-Size Image
The Anderson Ave Tunnel under construction 
 
Note cut and cover method. The width of the tunnel excluded subway cars from utilizing the line because the width was set to El third rail clearance, A connection from the Lenox Ave Line to 155th St was planned but never built because of the tunnel width.
Name:
Home Page:
E-Mail:
Comment:
Verification:
Enter the eight largest characters into the box below.
Verification Image I can't read this