The Beach House Privacy/Wind Lattice Project. At the left is the before picture and at the right is the after picture. The lattice runs from the front of the house to the back of the house on each side (but does not include the deck, which is on the seaward side) and across the back. In under the house it encloses a room about halfway back. The idea is to keep the wind from eroding the sand under the house, as well as to keep stray tourists from infiltrating the space under the house for whatever purpose they think of – and I won’t mention any.

This is a view under the building taken near the front piling on the right side – it shows the elevator and the boardwalk which is behind the front stairs. There is room on either side for future paved parking. There is a gate into the lattice room from the front (at the end of the board walk by the elevator and then another gate out the back to the beach. Because of the possibility of drifting sand we made the back gate up rather high – and that is the reason for the new bridge which runs from the old boardwalk to the back gate. Actually the bridge was an afterthought. The original plan was to have stairs going up and through the gate and then down into the “Basement” which is what you see above. But the basement is in the future and about four steps of the stairs got buried when we filled the hole we had dug. But they are there if the sand ever washes away. Of course, if it ever gets that bad the stairs may wash away as well, but we hope not. Anyway the bridge was built instead of the inside stairs. Since this picture was taken the last sheet of lattice arrived and the back gate is now complete. July 2002

HOME