CLICK ON PICTURE FOR LARGE VIEW
FIRST TWO LOADS OF DIRT.
GETTING MATERIAL TOGETHER.
BUILDING THE MOUNTAIN AND COAL MINE.
BUILDING THE TUNNEL.
CUTTING PASS BETWEEN TUNNEL AND MOUNTAIN.
LAYING SUB ROAD BED.
GETTING READY TO POUR FOR BRIDGE FOOTERS.
CYPRESS WATER WHEEL FOR WATER FALL BEING INSPECTED.
LAYING TRACK ON SUB BED.
GETTING TUNNEL READY.
BRIDGES OVER RIVER, AND UNDERPASS.