Site hosted by Angelfire.com: Build your free website today!

wpe53.jpg (29036 bytes) FIRST TWO LOADS OF DIRT.

wpe27.jpg (32561 bytes)  GETTING MATERIAL TOGETHER.

wpe2A.jpg (28295 bytes)  BUILDING THE MOUNTAIN AND COAL MINE.

wpe50.jpg (35466 bytes) BUILDING THE TUNNEL.

wpe48.jpg (27712 bytes) CUTTING PASS BETWEEN TUNNEL AND MOUNTAIN.

wpe4A.jpg (29097 bytes) LAYING SUB ROAD BED.

wpe4C.jpg (34538 bytes) GETTING READY TO POUR FOR BRIDGE FOOTERS.

wpe39.jpg (30155 bytes) CYPRESS WATER WHEEL FOR WATER FALL BEING INSPECTED.

wpe3B.jpg (32081 bytes) LAYING TRACK ON SUB BED.

wpe3D.jpg (35063 bytes) GETTING TUNNEL READY.

wpe3F.jpg (30713 bytes) BRIDGES OVER RIVER, AND UNDERPASS.

 

click here for CRR roster power