Welcome to picture page 4



Not much has changed since the last page was added, BUT I did get the saw mounted and running. This picture shows how I mounted the motor in conjunction with the drive belt and pulleys.
A cool pic of the bot with the electronics (except for the motors) taken out. Solid as a rock!!
For those of you wondering which technique I used to mount the sawblade to the shaft. I simply bolted the saw to the pulley itself. So the torque is transmitted through the bolts, not the shaft via keyway or roll pin etc.. etc.. This picture shows how it's done.

Click Here to go home or back to Page 3 or Page 2 or Page 1
Site hosted by Angelfire.com: Build your free website today!