1/9/01
19.00 Demonstration 20.00 Tea aboard 20.30 Test drive two miles down river 21.00 Tie up at Banagher jetty
2/9/01
09.02 Depart Banagher 09.24 Grand canal junct. 10.37 Bord na Mona railway bridge 10.45 Enter river Suc. 11.00 Exit river Suc 11.05 Tie up at Shannon Bridge 13.42 Depart S.B. 14.36 Arrive at Clonmacnoise 17.15 Depart Clonmacnoise 18.05 Arrive at Shannon Bridge
3/9/01
07.30 Depart S.B. 08.22 Arrive at Clonmacnoise (Breakfast) 09.40 Depart Clonmacnoise 11.25 Arrive at Athlone. Tie up below lock 11.40 Enter lock 12.00 Exit lock 12.20 Tie up at Jolly Marina (Lunch) 14.50 Depart J.M. 14.55 Pass under bridge on by-pass just north of Athlone 15.03 Enter Lough Ree 16.10 Reach Derry bay 16.35 Pass Leveret Island 16.55 Turn round in Inny bay 18.45 Reach Jolly Marina
4/9/01
12.35 Depart J.M. 12.50 Depart fuel rig 14.10 Warren point 14.47 Marker No 7 16.05 Tie up at Lanesborough5/9/01
11.12 Depart Lanesborough 12.30 Enter Tarmonbarry lock 12.45 Exit lock 13.00 Pass under raised bridge 13.40 Reach Roosky lock 14.55 Enter lock 15.15 Exit lock and tie up just north 16.33 Depart quay 16.38 tie up just below Roosky bridge6/9/01
10.45 Depart Roosky 11.25 Enter Lough Boderg 12.05 Reach Albert lock 12.10 Enter lock 12.15 Exit lock to canal 12.43 Exit canal 12.47 Arrive at Jamestown 12.50 Depart Jamestown 13.15 Tie up qt upper side of Albert lock 14.10 Enter Albet lock 14.15 Exit lock 15.40 Pass under Roosky bridge 14.45 Enter Roosky lock 15.55 Exit lock 17.05 Tie up to bank above Tarmonbarry bridge 17.35 Pass under raised bridge 17.45 Tie up for the night above Tarmonbarry lock7/9/01
12.05 Enter Tarmonbarry lock 12.20 Exit lock 13.30 Arrive at Lanesborough 14.45 Depart Lanesborough. 17.47 Reach Athlone bye pass bridge 18.05 Take on fuel. 18.20 Tie up at quayside above Athlone lock8/9/01
09.40 Untie and wait for lock to open 09.50 Enter Athlone lock 10.00 Exit lock 11.26 Clonmacnoise 12.10 Shannonbridge 14.25 Tie up at Banagher quaysideEND OF TRIP -- HOME