Paving Construction
Everybody help in the paving project. A plan were drawn before the pavers were purchased. The pavers came from the paving shop at Old Geelong Road, Hoppers Crossing. The area was levelled first with a layer of crush rocks. It was then compacted.
Two pieces of timbers were first placed at a distance. The sand was then shoved
in from the wheel barrow. A piece of timber was used to the sandy area. The
pavers were then laid with the help of a mallet. At the edges, timber were used to
temporary hold the pavers in placed. Later, mortar were used to hold the pavers at
the edges.
Some of the pavers were cut with a diamond blade angle grinder.
There were yellow pavers laid around the water fountain.
The pavers in the Japanese garden were laid in such a way that one could walk through and
around the Japanese.
Pavers were also laid at steps to the rear part of the house at
well. Pavers were laid as stepping
tortoise steps along the western boundary of the house.
The Site, The Location, The Plans, The Builder, Projects in Progress, Future Projects
Porch, Entrance, Master Bedroom, Ensuite, WIR, Office, Living. Dining, Kitchen, Family, Study, Laundry, Meals, Bedroom 2, Bedroom 3, Bedroom 4, Bathroom, Hallway, Paintings, Family Potraits
| The Home | The Site | The Plans | The Grand Dream Garden | Home |