Projects
In Progress
Bright ideas always comes along sometimes even before a
project is completed. We often discussed our projects
over the white board in the office.
![](mbgdnunderconstruction.jpg)
Column Garden under
construction
![](progress1.jpg)
Roofing in progress (in
front of living room)
![](progress2.jpg)
![](progress3.jpg)
|
- Purchase and install
brighter light for the garage (completed 2/6/01).
- Bagged garage brickwall with
a lighter colour to make the garage brighter
- New door with glass
installed (3/2002)
- Purchase door from garage to
office (6/2001)
- Install door to garage,
additional power points for garage, study,
additional switches for garage light
- RCA cables from family room
to master bedroom (6/2001)
- Garden bed underneath
clothline. (6/2001)
- Feature Artwork made of
stamps (7/2001)
- Door to garage from the office is to be
constructed.(completed 6/2001)
- Completion of web site
(7/2001)
- Activate video RCA cables
from family room directly to master bedroom. This
will enable us to also watch DVD or record video
tapes in the master bedroom. (completed 5/2000). Master bedroom feature wall in columns of
green and light green adn decorative wall paper
edging. (12/2002)
- Complete rear garden bed
just under outdoor cloth lines. (completed
6/2001)
- Double dragons - purchase two dragon heads
and create a long tail and hand it on the
ceiling (7/2001)
- Stamp art - placing stamps close
together to make a nice piece of art (7/2001)
- Finger stamping printing -
for the family each stamping a different colour
print with chinese words of wisdom written on it
(7/2001)
- A new family family potrait
picture - to be made of many photos. (7/2001)
- Computer hardware art - old computer hardware
to be hang on the ceiling (7/2001)
- Feature Decorative clay
tortoise flower pot, half flower pots to hang on
walls (8/2001)
- Feature tiling from garage
to office room. Choose tiles and rent tile
cutter. (completed 8/01) Photos will
be available.
- Water tank - install base;
install to drain water from gutter and overflow
onto stormwater drain. Purchase water
pump. (completed 9/01)
- Gallery edging/skirtings and
architraves with rosettes ands often pointed
corner edges (10/2001)
- Office and Dining Room
architraves with round rosettes (10/2001)
- Decorative architraves for
single lengths pantry, wider lengths for laundry
cupboards, double lenghts for WIR and Dylan's
room. They are to be painted in darker shadesof
green. (completed 10/2001). Replace architraves
for pantry, bedroom2, master bedroom and laundry
with wider and thick ones. (11/2002) Alternate
dual switch for garage light and additional
lights - completed 11/2001
- Three tier shelves for
master WIR (both sides), two tier shelves for
Dylan's BIR and three tier shelves for Joshua's
BIR (11/2001). To touch up corner joints. Three
tier WIR for guest room. Feature light purple
wall and decorative wall paper edging. (12/2002)
- Remove 1 metre width of lawn
along the eastern boundary to ease lawn mowing.
Plant a row of Kangaroo Paw. Connect sprinkler to
Station 6. (completed 11/2001)
- Remove and dig edging of
lawn to ease mowing around the front side garden.
(completed 12/2001)
- Remove everything from the
shed to the garage. Remove MDF flooring. Lift up
the shed about 500 high and fill with crush rocks
and yellow sand. Remove 9mm small pebbles from
the front pathway and filled with new layer of
crush rocks. Reframe and installed MDF flooring
back. Throw away junk and rearrange the shed
nicely. - (completed 12/2001)
- Plastered archway with
decorative corbels for the entry to the hallway.
A pair of corbels will also be installed. -
(completed 11/01)
- Shady pergola fronting the
living room. The holes for the posts were dug
already. Two full height columns will be erected
in this area. To erect Orchid garden tiered
shelves as well. (completed 1/2002). To cover up
this area with laserlite. (completed 1/2003)
- Move vege garden to clothline area.
(completed 12/2002)
- Rebuilt the orchid garden
with round pine posts and shade cloth, etc
(completed 1/2003).
- Plastered archway with
decorative corbels for the entry to the hallway.
A pair of corbels will also be installed.
(completed 10/01)
- Two half height columns will
be erected at the front gates. Bamboo plants to
be planted on top of the columns and irrigated
with sprinklers. (completed 11/2001)
- Construction of the verandah
on the south side. The draft building plans have
been drawn already. The verandah will have a
metal roof and skylights sheets. It will have a
box top round the three columns. An outdoor
kitchen will be constructed on the south side. It
will be decorated with decorative keystone and
light weight edging. (completed 1/2002)
- To purchase 6 BBQ covered
burner with side burner for outdoor cooking.
(completed 12/2001)
- Decorative shelfs and
feature plastering in the Ensuite area.
(completed 11/2002)
- Laundry feature walls in shades of blue using a
hair comb (completed 1/2003)
- Rip out and replace existing
architraves with thicker and wider ones in the kitchen, master bedroom, pantry,
bedroom2-4. Move the skirting around the kitchen
area higher(completed 11/2002)
- Other project to progress
after the completed of my Lotus R5 CLP exams or
if our budget permits. (completed 9/2002)
- Master bedroom feature
skirting and architraves. (entrance). Master Bedroom Feature Wall (completed
12/2002)
- Cubby house project will be
constructed next the playground. (under construction Now Completed 2/2003)
- Feature plastered decorative
plastered wall feature for ensuite. (completed
12/2002)
|