Department: Information
Services Academic Year: 2008-09
Completed
by: Mike Davis
1. Mission Statement:
1 |
2 |
3 |
4 |
5 |
6 |
Intended Outcomes |
Assessment Measures |
Performance Criteria/Expected
Results |
Related Strategic Plan Goal |
Results and Planned Actions |
Expected Improvements (Close the Loop) |
Improved
data disaster recovery plan. |
Data
backup equipment installed at a location at least 100 miles away from LCCC |
Backup
equipment installed by summer, 2009. |
4.4 4.5 |
|
The
installation of data backup equipment at a remote location will allow the
college to access data in the event data is destroyed on campus due to a
disaster. This will minimize operational down time. |
Student
correspondence from the college, other than in person, will be done
electronically. |
1) Portal
will be installed to support student email. 2)
Students will be assigned a college email address to handle correspondence. |
Student
email portal will be installed and working by fall, 2009. |
5.6 |
|
Corresponding
with students through a college assigned email address will ensure that
students have access to assignments and relevant information |
Conversion
to the Banner administrative software system will be complete. |
All
business processes within the Banner administrative software system will be
operational. |
Conversion
will be completed by fall, 2009. |
4.4 4.5 |
|
The new
administrative software system will lead to improved student services. |
NOTE: assessment should focus on effectiveness, efficiency, constituent satisfaction, or impact on functions, services, processes or student learning.