Site hosted by Angelfire.com: Build your free website today!

WORKS


Hydraulic Work

PIC3 The hydraulic work has been constituted as the companies speciality. Important works like the "Cutzamala" system are among the proyects carried out by DISA, where considerable diameters of up to 109" in steel as in concrete [preforzado].
See Chart 1.

PIC13
The weld in tubing has been a base for achievements in our facilities, having specialized personnel and certificated by international standard like these managed by PEMEX.




Roads and Paths

PIC9 Roads and Paths are works that require wide experience and technique. In order to offer this service, DISA has the necessary technology and infreastructure to obtain the best results.







Specialized Works

PIC4 Along the time, high degree of specialization works have been commended to us, such as : interconections, valve installations, etc. One example is the contract for the modification of the "Obra de Toma" (water extraction and pumping) in the "Cutzamala" system proyect.
This was a specialized work in which obturator cameras were used for the demolition of concrete armed walls at 20 mts. under the water level, supported by weld work and underwater maneovers.


Chart 1: Managed Diameters
TUBE
Concrete/Steel
DIAMETERS
12"
14"
16"
18"
.
.
.
99"
109"


[HOME]