Recent Town Improvements.
______________________________________


Summer 09 Library moved to S.Main.


New City Hall summer 09.


Cell tower turned on southeast of town 08.



Oct 4, 2007 Grand Opening
Family Dollar.

Sewer Replacement by "Pipe Bursting."
Work was done by Miller Pipeline of Indianapolis.

  
Plastic sewer pipe replaces old leaky sewer in several areas of town.
The old sewer pipe is "burst" by a special tool that drags the new pipe behind it.


Highway signs created and donated by Danny and Diane.
Diane got caught planting flowers around this one.


  
Townsends" Tree Service downtown.


New bridge on South St. behind the Nursing Home.

Main Street Paving End to End.
  

West Howard Street Paving.



New Larger Water Tower.

  
Ground breaking 8/5/99...In service 12/15/99.

New Water Mains.

  
2000 feet of new water main in 1999.
Boring under the railroad....Trench cut on Howard St.

Water Plant Renovations.

   
Both softeners replaced after squeezing through the door...New electrical control panel.

Downtown Sidewalk Replacement.
   

____________________________

Downtown Corner Landscaping.
  
Northeast corner of Main and Howard got new sidewalks and curbs.
Old sidewalk was dug out by Rex and hauled away by Terry and a local contractor built the new sidewalk.


The finished product..plus extras. Fred Ludington then got permission to fix up the triangular plot between the building and the walk. With help from Swallow's Landscaping, they turned it into a garden spot that had folks in amazement all week, and just in time for the fair.
Complete with greenery and simulated windows, doors and curtains painted by __________, over the existing plywood that covered the openings.
What a change for the downtown corner.

A Second Little League Ball Diamond.