The statistical information on planned monthly
activities in shops is as under:-
WELFARE
ACTIVITIES
An association is effectively working to look after
the sports, welfare and cultural activities for workshop employees and
their dependents.
·
Constructed Community
Hall with the aid of award money received by shops in recognition of best
performance from time to time. ·
Cash awards to the
employee's meritorious children who have pass distinction in 8th to 12th
standard every year. ·
Extending financial
assistance to the needy person on medical grounds on one time basis. ·
Developing orchestra teams to
participate in inter division/Railway competition. RECENT SYSTEM IMPROVEMENTS
·
Air
·
Developed test rig
for testing leakages in FP & BP pipes. ·
Engraving of POH
details on water tanks attended has been introduced for positive
traceability. Earlier
these details were being stenciled in paint. ·
A
Distribution Valve cleaning stand has been developed in-house and put into
use in Component Repair Section. ·
A
separate Bosch tank has been commissioned in Lifting Shop to enhance the
coach POH activity. ·
Suspension bearing for
electric locos developed. ·
Facilities for repair to
EMU bogies were developed and 6 Nos. were repaired and dispatched to TPYS.
Like wise 3 Nos. of Co-Co bogies were also repaired for Gooty Diesel
shed. ·
Due Innovation in the
method of manufacture of Co -CO bogie components has resulted in saving of
man-hours. The cost of each bogie has been reduced by over one lakh
rupees. ·
Volumetric testing and
back pressure testing for AC coach compressors have been started after
designing and fabricating suitable test bench inside the workshop. ·
Manufactured and
commissioned electrolyte recycling plant at TLW which not only resulted in
saving of Rs. 45000/- per annum but also helped in minimizing industrial
pollution. ·
Manufactured and
commissioned 75-ton traverser for carriage movement at a cost of Rs. 20
lakhs as against the market cost of Rs. 1 crore. ·
Manufactured and commissioned axle guide
circlip groove cutting machine for modification of old guide without
dismantling from bogies which has resulted in annual saving of Rs.
2,64,78,144/- considering the cost involved in renewal of these
guides. · A roller bearing cleaning plant has been manufactured indigenously. · In order to
provide adequate floor area for Air Brake Overhauling Section in Lift
Shop, the existing vacuum Brake Cylinder, DA Valve and SAB
Overhauling/Testing Section has been shifted to new location duly
providing all the facilities. · Gadget has been
developed for local testing of brake beams during POH · 3 Tonne capacity
Hoist Gantry has been provided for 25 Meters length in Smithy Shop to
facilitate manufacturing of ICF Bogie Bolsters. Millwright shop staff has
done this work. ·
Emergency openable
window design has been simplified by provision of hinges on one side and
spring loaded tower bolt on other side. This is simple for manufacturing
/fitment, more reliable in operation compared in operation compared to
earlier design. · Emergency openable
window developed for larger windows of AC coaches. · Emergency open able window developed for AC
chair cars. · Illuminated sign Board has been provided to centenary Hall that
gives better look. OTHER
ACHIEVEMENTS
·
95 wheels (79 ICF+7
BOXN+9 Diesel BG) supplied to Divisions. · All the air brake coaches have been turned out with the standard color scheme of aircraft blue and satin blue As a marketing organization, this workshop has extended its support to sister Railways in manufacturing new components required by various Division/Sheds/Railways.
|