Construction Picture's 02/17/88

Site hosted by Angelfire.com: Build your free website today!

Construction Picture's 02/17/88

A different view of the 1st half of the boomerang

The second loop is getting topped off

Another view of the top of loop # 2 being added

The Second loop being welded

The 2nd and 3rd loops

This was taken earlier in the day,,showing the top of loop #2 being lifted into place

The 2nd loop is completed here

Another view of the 2nd loop

Another view of the 2nd loop being lined into place