Area behind garage contains two xeriscape gardens - this is one of them at the beginning of construction. |
|
Stepping stone installation - bricks were pinned into ground using rebar, then covered with concrete. |
|
For drainage, broken bricks were distributed on ground, covered with a layer of bull rock, then topped with a layer of brown landscaping rock. The drainage system is about 1 foot deep. |
|
|
Soil and nutrients were mixed with 50% pea gravel and distributed over drainage system. |
|
|