Site hosted by Angelfire.com: Build your free website today!

Last Completed Project


Having these cavites (stone terraces) built on the backside of the church and some restrooms was one of the last project that my father had the students build. He got to see it completed. He was also having a new water well drilled but he didn’t live long enough to see them bring up water. That came 2 weeks later. The first bucketful was poured on top his grave.