| The septic is installed. |
| The cabinets are installed. |
| The Pond is dug. |
| The Brick is done. |
| The well is drilled. |
| The drywall is mudded and sanded. |
| The walls are all drywalled. |
| The insulation is done. |
| The electrical rough-in is complete. |
| The electrical system is born. |
| The roof is now 90% complete. |
| Pages 14 though 18 updated with captions. |
| Access this site through
www.jamookie.com
|
| The web site is now add free!!!
|
| The garage is framed and backfilled.
11/4/03 |
| The framing has been started. 10/24/03 |
| Garage footers poured and floor system
delivered 10/17/03 |
| |
| Floor plans and artist rendition added |
| More pictures added 9/28/03 |
| Web site is reborn 9/24/03 |