8/18/04: We finally moved in...well kind of...check out all
of the unfinished jobs, and the mess of boxes!
|
|
|
|
What a mess. Since the inside is not completely done, we have a lot of stuff stored in the garage. |
|
|
|
|
|
|
|
|
What we have been waiting for...the C.O.O. - Certificate Of Occupancy. |
|
|
|
|
|
|
|
|
|
The kitchen viewed from the laundry room. |
|
|
|
|
|
|
|
|
The kitchen sink is not installed yet, as the counter top needs to be sent back for corrections. |
|
|
|
|
|
|
|
|
Here is our temporary computer desk. |
|
|
|
|
|
|
|
|
The floor trim is completed in the great room. |
|
|
|
|
|
|
|
|
|
Here is the ceiling beam in the kitchen. A fan will be installed here. |
|
|
|
|
|
|
|
|
The lighting in the dining room is completed. |
|
|
|
|
|
|
|
|
Here is my temporary closet. |
|
|
|
|
|
|
|
|
Here is the beam and fan in the study. |
|
|
|
|
|
|
|
|
The shelving systems are put together in the walk-in closet. |
|
|
|
|
|
|
|
|
There is shelving, clothes racks, and drawers. |
|
|
|
|
|
|
|
|
The doors above have shelves behind them. |
|
|
|
|
|
|
|
|
Here is the bathtub in the master bath. |
|
|
|
|
|
|
|
|
There will be a border of tile on the wall when it is finished. |
|
|
|
|
|
|
|
|
The shower starts to take shape. |
|
|
|
|
|
|
|
|
Check out the border. The picture lloks smudged, but it is really where I tested some grout to check the color. |
|
|
|
|
|
|
|