The new house, page 51

8/18/04: We finally moved in...well kind of...check out all of the unfinished jobs, and the mess of boxes!

What a mess. Since the inside is not completely done, we have a lot of stuff stored in the garage.

What we have been waiting for...the C.O.O. - Certificate Of Occupancy.

A closeup.

The kitchen viewed from the laundry room.

The kitchen sink is not installed yet, as the counter top needs to be sent back for corrections.

Here is our temporary computer desk.

The floor trim is completed in the great room.

The breakfast room.

Here is the ceiling beam in the kitchen. A fan will be installed here.

The lighting in the dining room is completed.

Here is my temporary closet.

Here is the beam and fan in the study.

The shelving systems are put together in the walk-in closet.

There is shelving, clothes racks, and drawers.

The doors above have shelves behind them.

Here is the bathtub in the master bath.

There will be a border of tile on the wall when it is finished.

The shower starts to take shape.

Check out the border. The picture lloks smudged, but it is really where I tested some grout to check the color.