The guy who laid the floor tile did a pretty good job, except that he forgot that the rear door opened-in. Consequently, the door couldn’t clear the tile, had to be removed and trimmed at the bottom.
The toilet is not quite ready for use, something about a sealant having to dry or harden, and than a second application.
The roof leaks in places; we need 7 days without rain or the roof completely dry before repairs can be made!
We will be signing the contract tomorrow but we got the KEY today!
Right after service the youth pitched in and helped with the moving and assembling. Afterwards we prayed over the building, every person and thing going in and out of it, etc. Then we all had kosher pizza (pizza without meat).
After dropping the youth off: Lura, R., M., and I went to Beersheva to purchase the chairs. We were able to get 4 for 99.99 shekels since we were buying 60.
It was tight but we were able to get all 60 chairs into the van. By this time Lura and I were dragging, R. still had pep and going strong.
When we got back to Arad, I dropped Lura off, and R., M. and I downloaded (smile) the chairs.
Edwin Beckford
02/14/04