 BCS PROJECT
 Final Semester Project Requirements & Description                                                                                             

                                                                                                                

 

Requirement of Project and Its Description.                   


Application Form for Project Approval and Registration
Project Groups Requirement.
Project Documentation Guidelines.
Project Cover Page.
Project Title Page.
Project Certificate.
Project Description.
Project ... (More links update very soon).



Application Form for Project Approval and Registration


Page 1 of 2



Page 2 of 2                    




Project Groups Requirement.



1. Select the group member two or four only.
2. Select the valid Project title.
3. Select the right tool Software and/or Hardware.



Project Documentation Guidelines.


01.    The text body font should not be less than 11 and greater than 12.
02.    The paper to be used for report should be ordinary and of A4 size.
03.    The paragraph spacing should not be less than 1.5 lines and greater than double lines.
04.    The left and right margins of the page should not be less than 2” and 1.25” respectively. The top and
          button margins of the page should be at least 1” each. The complete documents (except the first page)
          should have numbers market at the bottom right of the page.
05.    The document should contain a complete reference section at the end of the report showing the list of
          books /journals/web sites referred to during preparation of the material. Any appendix to be added to the
          report will be after conclusions.
06.    The project report should not contain any color fonts.
07.    The project report should contain abstract, background / history of pervious work done in the same filed,
         current trends in the same area of work/ made by the student during period of the project and conclusions.
08.    The electronic version of the report will also be submitted along with hard copy for future quick reference
          through web.
09.    The man heading font should be 14, and bold while sub heading should not be less than 11 and greater
          than 12 will bold face.
10.    The text font will be ARIAL or TIMES NEW ROMAN
11.    Allowed fonts sizes are 10, 12, 14, 16 & 18
12.    Recommended color for Binding is MARON or DARK GREEN or LIGHT GREEN or BLACK
         Note: Get the advise from me for colour selection before Project Final Copy .



Project Cover Page.



Your Project book's Front Side look like this



         Note: Get the advise from me for colour selection before Project Final Copy .




And Left cover Side



And back side plane page (no text and not use other colors).



Project Title Page.





IMPLEMENTATION TECHNIQUE OF ALGEBRAIC PROCESSING

Project submitted for the degree of Bachelor in Computer Science


Submitted by:

SAJJID HAYAT                            89

SYED MODASSIR AZAM           68

ASIF RAZZAQ                              02

SULTAN AHMED                        19


Supervisor:      Mr. ABDUL HAFEEZ





PETROMAN TRAINING INSTITUTE,
Main Campus, Karachi.

Affiliated with:
SHAH ABDUL LATIF UNIVERSITY, Khairpur.








Project Certificate.






PETROMAN TRAINING INSTITUTE,
MAIN CAMPUS, KARACHI

Date:_____________




Certificate

        Note: Please verify this certificate before Signature and Project binding.



This is certify that Mr. ABC-------------------XYZ  s/o ABC----------XYZ was assigned project A Study of implementation technique of algebraic processing for the partial fulfillment of B.C.S Degree program. Project report is submitted by the  student before the committee for its evaluation. The project report was found according to the University requirements.





_____________________                                                                      ____________________

SUPERVISOR                                                                                     PRINCIPAL
Mr. ABDUL HAFEEZ                                                                            Mr. M. MURTAZA








Project Description.


..........






Project ...