SIGNIFICANT EVENTS
- Jan. 21, 1967
- Dinning Hall (13,380 sq ft) completed. Total construction time for this facility was seven days. Cost: $10,381.66
- Feb. 2, 1967
- Mars Building (512 sq ft) completed. Cost: $1,072.48
- Feb. 16, 1967
- Received construction directive to construct water well.
- Feb. 16, 1967
- Airman Rec Hall (2130 sq ft) completed. Cost: $4,495.44
- Feb. 16, 1967
- Air Police Support Building/K-9 Area (1088 sq ft) completed. Cost: $1,409.92
- Feb. 18, 1967
- Sewer System/RH Cantonment Area (3194 lin ft) completed. Cost: $2,693.92
- Feb. 18, 1967
- Latrine/RH Area (1400 sq ft) completed. Cost: $5,301.86
- Mar. 12, 1967
- Two Latrines/RH Area (2800 sq ft) completed. Cost: $6,394.51
- Mar. 17, 1967
- 26 Personnel Bunkers completed. Cost: $6,042.00
- Mar. 20, 1967
- Received construction directive to install Aircraft Arresting Barrier on Main Runway.
- Mar. 24, 1967
- Received construction directive to proceed with construction of Squadron Operations Building.
- Mar. 24, 1967
- Received construction directive to construct Para/Dinghy Shop.
- Mar. 31, 1967
- Base Supply/Equipment Building (30,000 sq ft) completed. Cost: $40,166.61
- Apr. 15, 1967
- Construct Communition Maintenance Building (4300 sq ft). Cost: $12,669.66
- Apr. 25, 1967
- Construct Admin 1050 Computer Building (4800 sq ft). Cost: $27, 771.94
- May 4, 1967
- Drill 100 ft Well. Cost: $11,567.42
- May 8, 1967
- Construct Temporary Pad for Rpcon using M8A1 Matting. Cost: $43,718.59
- May 10, 1967
- Construct Temporary LOX Plant Pad. Cost: $1134.07
- May 10, 1967
- Construct 1 ea Mess Hall Base (13380 sq ft). Cost: $24,705.78
- May 12, 1967
- Construct Dispensary Annex (1920 sq ft). Cost: $18,740.96
- May 12, 1967
- Placed Concrete Pads for 2 CE Shops and 2 CE Office Bldgs. Cost: $11,870.10
- May 18, 1967
- Strip Base Industrial Area. Cost: $31,332.34
- May 22, 1967
- Erect C7A Maint Bldg (9600 sq ft). Cost: $27,155.55
- May 26, 1967
- Install Bak 12 Barrier. Cost: $15,630.28
- May 26, 1967
- Construct Helicopter Apron. Cost: $21,131.10
- May 26, 1967
- Construct Taxiway and Warm Up Pad. Cost: $21,131.10
- Jun. 1, 1967
- Construct Subsistence Store (5600 sq ft). Cost: $22,676.48
- Jun. 5, 1967
- Erect A & E Bldg (25600 sq ft). Cost: $55,265.83
- Jun. 5, 1967
- Erect General Purpose Shop (28000 sq ft). Cost: $64,956.39
- Jun. 5, 1967
- Erect I & R Bldg (16800 sq ft). Cost: $42,801.55
- Jun. 5, 1967
- Erect AGE Bldg (5600 sq ft). Cost: $21,325.30
- Jun. 8, 1967
- Construct 2 ea. Dikes for Base POL System. Cost: $1,631.98
- Jun. 9, 1967
- Construct Maint Control Bldg (4800 sq ft). Cost: $9,782.06
- Jun. 13, 1967
- Construct OSI Bldg (960 sq ft). Cost: $6,173.58