Site hosted by Angelfire.com: Build your free website today!

Studding phase

This view looks into the front of the theater, towards the seating area and also shows the equipment closet nicely.

A view towards the screen wall. The window will be covered by a pulldown shade and the screen will be infront of that. The "helper" laying down on the job is Sarek, our Alaskan Malamute.

A view towards the seating area. The rear door can be seen that leads to the just finished ticket booth. The old insulation and vapour barrier was removed once studding was complete. You can see the wooded 2x2's behind the studs that the romex was attached to. The 1 5/8" studs are not wide enough to run Romex through without some protection so I ran it behind instead. No problem passing the electrical inspection.

Another view directly looking into the equipment closet.

Insulated all the walls and ceiling.

Another insulation shot. You can just see the 18" fluorescent tube used in the star panel and also the 2x2's used to frame it out. It would have been MUCH easier to do this AFTER the drywall was up!