Site hosted by Angelfire.com: Build your free website today!

U702

July 8, 1940-The keel of the U702 is laid in the HC Stülcken shipyards in Hamburg.

September 3, 1941-The U702 is commissioned and joins the 5th Flotilla in Kiel for training.

September 9, 1941-During trials and training, the chief engineer aboard U702 is killed.

March 1, 1942-The U702 is reassigned to the 7th Flotilla in St. Nazaire for active duty, and departs for the submarines first war patrol.

April 3, 1942-The U702 is sunk in the North Sea by a floating mine while en route back to Bergen.

Back

Return to the Total Warfare Main Page
Statistics:

Armament: