• Develop hydrology/hydraulic flood routing of the spillway system to meet the required storm event, based on the dam’s classification
• Determine if the existing spillway system will need upgraded, repaired or replaced
• Evaluate the geotechnical stability of dam
• Determine if the dam is a candidate for a reduced reclassification based on size and downstream potential hazards
• Prepare engineering drawings of dam embankment and spillway system
• Design trash rack and lake drains
• Design toe drain systems to reduce ground water seepage within dam