Later on in March..........
Done lots of stuff you can't see...new cambelt, oil, fan belt, power steering belt,oil air and fuel filters, some new hoses and clips, new second battery..................... started on plumbing in my partially built "back of house" or garage, having now got the eberspacher running right, i am using vauxhall heater matrix for the rear heating, i was going to use the fresh air or recirculated air option fron the air box, but have changed my mind as the fresh air inlet could possibly suck fumes from the eberspacher in certain circumstances, i am also working on putting a water tank above the calorifier that would automatiacally top it up, i may have a go at fabricating a grp tank myself.
I've put in the carcas for the mp3/radio, and fitted a small 12 switch panel for the fresh air blower, step light and roof lights, it also has a 12volt output (original ambulance equipment) which i am using to run the charger through at the moment, also fitted the mains supply below, i think i'll just leave it as the 2 mains sockets as i can't see me being on hook up much (like wildcamping), and don't envisage taking any 240 volt equipment anyway.
Also started to fit the drop down bunk above the cab, this will be used as bedding storage during the day.
home
previous
next