End User |
Year |
Project |
Scope Details |
Dream Land |
1998 |
Sewage Treatment Plant |
- Complete electrical design and system integration.- Preparation of electrical B.O.Q. - Grounding system installation and testing. - Instrumentation installation and testing. |
Mirage Resort (Hurgada) |
1998 |
Sewage Treatment Plant |
Main Electrical and Control Panel design. |
Sun Flowers Resort (Hurgada) |
1998 |
Sewage Treatment Plant |
Main Electrical and Control Panel design. |
Reef Oasis Resort (Sharm El Sheikh) |
1998 |
Sewage Treatment Plant |
Main Electrical and Control Panel design. |
ENPPI |
1998 |
Chlorination Plant |
Main Electrical and Control Panel design. |
Shebin El Kom Hospital |
1998 |
Sewage Treatment Plant |
Main Electrical and Control Panel design. |
Caribbean Beach Resort |
1998 |
sewage treatment plant |
Main Electrical and Control Panel design. |
PETROJET |
1998 |
sewage treatment plant |
Main Electrical and Control Panel design. |
ABB Susa |
1998 |
Sewage Treatment Plant |
Main Electrical and Control Panel design. |
El Nour We El Iman Village Arish |
1999 |
Residential Area Infra Structure |
Outdoor electrical, water and sewage facilities design. |
West Suhag City |
1999 |
Chlorination Plant |
Main Electrical and Control Panel design. |
Ghazala Village |
1999 |
Water treatment plant |
|
Qarun Petroleum Co. |
2000 |
Oil Receiving Station |
P&I Diagrams Drawings. |
El Malha Development |
2000 |
RO units and Sewage Treatment Unit |
Electrical and instrumentation installations. |
Alexandria Oil Company |
2000 |
Oil Blending Plant |
Preparation of Cables Bill Of Quantities for units 1&2. |
Tanta Governorate |
2000 |
Industrial Waste treatment Plant |
Mechanical and Piping Isometrics Design. |
Aswan Governorate |
2000 |
Aswan Water Treatment Plant |
Mechanical and Piping Isometrics Design. |
|
2000 |
Industrial Waste treatment Plant |
Complete Plant Electrical & instr. Installations. |
Ministry of Electricity New & Renewable Energy Authority |
2000 |
Experimental 15kW Wind Turbine Generation Unit |
Control system design |
Multinational Forces Org. (Sharm El Sheikh) |
2000 |
Waste Water De-watering System |
Control system design, FAT of PLC and site commisioning. |
Egyptian Ministry Of Irrigation and Water Resources |
2000 |
Bahr Tanah (Mansoura) Irrigation System levels control. |
Control system design |
Egyptian European Pharmaceutical Co. |
2001 |
Water Treatment Plant |
Piping And Isometric Design |
Marsa Alam Development |
2001 |
Deep wells raw water Pumps sys. Feed RO plant |
Electrical and Control System Design |
Four Seasons Hotel Sharm El Sheikh |
2001 |
Reverse Osmoses, Deep well pumps and Sewage Treatment Plant |
Complete Electrical Installations |
Domtty Factory |
2001 |
Industrial Waste Treatment Plant |
Complete Electrical Installations |
Hydraulic Power Generation Company- Egypt |
2001 |
High Dam Control System Upgrade by Alstom Hydro |
Quality Assurance Technical support |
Tanta for Oil and Soap Factory Tanta |
2001 |
Industrial Waste Treatment Plant |
Electrical Works Site Installations |
Bisco Misr Cairo |
2002 |
Industrial Waste Treatment Plant |
Electrical Works Site Installations |