11/25/03: The crew works hard to install the roof sheathing
and make the house waterproof before the nasty weather hits.
|
|
|
|
The Andersen windows were delivered today! |
|
|
|
|
|
|
|
|
Lumbertown comes back a little later with a load of roofing suplies. |
|
|
|
|
|
|
|
|
Keven and Mitch install the breakfast room window, while Tracy sits inside and does nothing. |
|
|
|
|
|
|
|
|
|
Here is the bathroom window. |
|
|
|
|
|
|
|
|
The same window from inside. |
|
|
|
|
|
|
|
|
Alaska Heating and Cooling cut the hole for the cold air return. |
|
|
|
|
|
|
|
|
They also cut the floor vents in each room. |
|
|
|
|
|
|
|
|
Pratt built the stairway for the basement. No more ladders!!! |
|
|
|
|
|
|
|
|
Here it is from the bottom. |
|
|
|
|
|
|
|
|
We finally pulled the 0-3 wire into the panel. This sucked. |
|
|
|
|
|
|
|
|
Here is the conduit that spans from the indoor panel to the meter base outside. |
|
|
|
|
|
|
|
|
Here are the great room windows. |
|
|
|
|
|
|
|
|
Another shot from the outside. |
|
|
|
|
|
|
|
|
The boys take advantage of the weather and secure some Tyvek. |
|
|
|
|
|
|
|