1/20/04: The insulation has been done for a week or two.
We also finished the electrical rough-in and started on the plumbing.
|
|
|
|
In the kitchen, I installed can lights on the ceiling. |
|
|
|
|
|
|
|
|
We decided to make a small nook above on the north wall of the great room. |
|
|
|
|
|
|
|
|
The side entry foor for the garage. |
|
|
|
|
|
|
|
|
Here, you can see the garage doors we installed. |
|
|
|
|
|
|
|
|
The front door was also installed. |
|
|
|
|
|
|
|
|
A closer shot of the front door. |
|
|
|
|
|
|
|
|
It is starting to look like a house. |
|
|
|
|
|
|
|
|
|
Here is our temporary mailbox. |
|
|
|
|
|
|
|
|
I put the dryer vent and hose bibbs in, in preparation for the up-coming brick installation. |
|
|
|
|
|
|
|
|
|
|
This is the attic access door I installed. It is frosty due to the cold air in the attic. |
|
|
|
|
|
|
|
|
This is how we are keeping warm. A 200,000 btu heater |
|
|
|
|
|
|
|
|
This is Fritz. He is our mouser. |
|
|
|
|
|
|
|
|
We insulated the mechanical room, also. |
|
|
|
|
|
|
|
|