4/20/04: Raymond Bair starts digging the pond. While
we would have preferred to spend this money later, it was necessary for the
geothermal heating system.
|
|
|
|
Oswalt's dumps a load of stone on the driveway. |
|
|
|
|
|
|
|
|
The pond is about half done now. |
|
|
|
|
|
|
|
|
I am standing in what will be the overflow area. |
|
|
|
|
|
|
|
|
The green pipe in the foreground goes toward the house for gutter and sump drainage. |
|
|
|
|
|
|
|
|
The near tee is an overflow for the gutter pipe, the far tee is where the pond overflow will attach. |
|
|
|
|
|
|
|
|
This is the dam on the north side of the pond. |
|
|
|
|
|
|
|
|
I am stding in the bottom of the pond for this picture. |
|
|
|
|
|
|
|
|
From the bottom again, you can see the east end still needs a lot of work. |
|
|
|
|
|
|
|
|
There is a little water now. In the background, you can see our roof. |
|
|
|
|
|
|
|
|
Raymond loads up the dump truck. |
|
|
|
|
|
|
|