11/27/03: Bob and I installed the meter base and ran 2"
schedule 80 conduit into the basement. Keven and his crew finished
most of the the roof today. The entire roof is covered in felt, making
the house almost waterproof.
|
|
|
|
On the west and south walls, sheathing covers up the windows to brace against the artic winds. |
|
|
|
|
|
|
|
|
The front porch is now nearing completion. The boys are on break, as the ran a few sheets shy on wood. |
|
|
|
|
|
|
|
|
The overhang for the front porch has been built. |
|
|
|
|
|
|
|
|
Here is the meter base we installed. |
|
|
|
|
|
|
|
|
The small pipe goes into the mechanical room to supply the house. The large one will hook up to the transformer. |
|
|
|
|
|
|
|
|
Here is the only roofing that needs completed...the two bay areas. |
|
|
|
|
|
|
|
|
After the heavy rains, some of the soil around the foundation start to compact, leaving some big holes. |
|
|
|
|
|
|
|
|
Here is another hole under the breakfast room door. |
|
|
|
|
|
|
|
|
Due to a small problem with the bathroom layout, Keven moved the window opening several inches to the left. |
|
|
|
|
|
|
|
|
Today, I was presented with this silly hat. Get your mind out of the gutter. |
|
|
|
|
|
|
|