The new house, page 29

12/1/03: This was a busy day.  The Andersen windows arrive and get installed, the basement stairs are completed, the HVAC work begins, and the electrical gets a swift kick in the pants.

The Andersen windows were delivered today!

Lumbertown comes back a little later with a load of roofing suplies.

Keven and Mitch install the breakfast room window, while Tracy sits inside and does nothing.

Keven checks for level.

Here is the bathroom window.

The same window from inside.

Alaska Heating and Cooling cut the hole for the cold air return.

They also cut the floor vents in each room.

Pratt built the stairway for the basement. No more ladders!!!

Here it is from the bottom.

We finally pulled the 0-3 wire into the panel. This sucked.

Here is the conduit that spans from the indoor panel to the meter base outside.

Here are the great room windows.

Another shot from the outside.

The boys take advantage of the weather and secure some Tyvek.

Home | New House 25 | New House 26 | New House 27 | New House 28 | New House 29 | New House 30 | New House 31 | New House 32 | New House 33 | New House 34 | New House 35 | New House 36 | New House 37 | New House 38 | New House 39 | New House 40 | New House 41 | New House 42 | New House 43 | New House 44 | New House 45 | New House 46 | New House 47 | New House 48